|
|
|
|
Please Note: The Kelowna Yard is our prototype yard. Anything seen is experimental and is not recommended for trial. |
|
The yard is located at 900 Block Clement Ave Kelowna BC. |
|
|
|
|
|
|
|
Air View |
|
|
|
|
|
|
Some Forms set up for trial casting |
|
|
|
|
|
|
Some Distribution Boxes prior to pour |
|
|
|
|
Poured D Boxes |
|
|
|
|
Our "Mexican Mixer" |
|
|
|
|
We take pride in "Recycling" So we often recycle old equipment. Here is an old road sander. |
|
|
|
|
Here's an old Ford 9000 with a Detroit Diesel. |
|
|
|
|
Here is the start of our new mixer. |
|
|
|
|
We take out the drag chain and put in a belt. |
|
|
|
|
A small auger is put in to pull out cement. |
|
|
|
|
Hydraulics run BELT | CEMENT | MIXER |
|
|
|
|
System |
|
|
|
|
Ed Hornby is "Batch Guy" |
|
|
|
|
Here is the first tank poured |
|
|
|
|
If we are making a top we use ultrarib pipe. |
|
|
|
|
We got tired of moving the Mexican Mixer, so we put the mixer on the back of the batcher. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|